Site Prep
We get raw ground ready for a new house, shop or tiny home. The clearing, the grading, the pad and the water line go in the order the build needs them.
Learn More
A house pad is the raised bed of packed dirt that a slab sits on. Key Equipment and Construction builds house pads and building pads for homeowners and landowners around Byhalia and North Mississippi. We build the dirt up and pack it firm. Where the plan calls for footings we dig them, then set the forms for the concrete.
Clearing and grading come before the pad, as part of site prep for a new build. We build pads for houses and shops, and for tiny homes on a solid foundation. Each pad is sized to the building that goes on it. After we look at the lot, we put the quote in writing.
Tell us what you need done and where the property is. We look at the job and put the quote in writing.
A good house pad starts on firm ground. Topsoil and roots break down and settle, so they come off before fill goes on. Fill should be clean dirt, since wood or trash buried in a pad can rot and leave soft spots. Then it is spread in layers, and each layer gets packed before the next one.
Packing, or compaction, cuts down on settling under the slab. Loose dirt keeps sinking after the concrete is on it, and uneven sinking can crack a slab. Fill packed firm, layer by layer, gives the slab even support.
Footings come next when the plan calls for them. A footing is a strip of concrete under the walls that spreads the weight into firm ground. State law calls for at least 3 working days' notice to Mississippi 811 before digging, so utility lines get marked. We dig the footings and set the forms around the slab area, and the pad is ready for the concrete.
The most common soil in Marshall County is a silty one called Loring. It has a dense layer 14 to 35 inches down. That layer slows water, so rain can sit on top of it.
Near Byhalia, the USDA soil survey lists that wet layer about 20 inches down from December through March. It rates the soil somewhat limited for houses without basements, mostly because of that wetness. A pad built up and packed firm lifts the slab and helps rain run off.
The ground around the pad matters too. Water that runs toward a slab from uphill soaks the edges of the pad. Land grading around the building shapes the yard so water moves away from it.
A shop pad is built the same way as a house pad. The building plan sets the size and the height, and the forms follow that plan. One pad we finished was for a 40 by 60 foot shop.
A shop with a bathroom needs its plumbing in place before the concrete. We dry fit it. That means we bring the line to the spot on the plan and stub it up for your plumber. Then the forms go on, and the rest of the shop building job follows.
A tiny home on a solid foundation starts with the same kind of pad. The tiny homes we build run about 600 to 800 square feet or less. The pad comes early in the job, after the lot is cleared.
Call or text for a written quote. We work about 100 miles around Byhalia across North Mississippi.
(662) 415-2919From the first call or text to the finished work, here is how it goes.
Call or text (662) 415-2919. Tell us what you want cleared or built, and where.
We look at the land and what you want from it. The slope, the soil, the trees and the wet spots all shape the work.
You get the quote in writing before any work starts. Once you say yes, we put the job on the schedule.
Clearing comes first when the land needs it. On a build, the grading, the pad, the footings, the driveway and the water line follow.
Your ground is ready for what you have planned for it. On a build, your other trades pick up from there.
Common questions about house pads around Byhalia and the rest of North Mississippi. If yours is not here, call or text and ask.
We get raw ground ready for a new house, shop or tiny home. The clearing, the grading, the pad and the water line go in the order the build needs them.
Learn More
We take a smaller shop from raw ground to a metal building on its pad. The clearing, the pad, the forms and the plumbing come before the building goes up.
Learn More
We build tiny homes of about 600 to 800 square feet or less on a solid foundation. We also clear the lot and build the pad the home sits on.
Learn MoreWe can clear the lot, take out the stumps, grade it and build the pad. The gravel driveway and the water line can come from us too.
We run our own equipment. When a job calls for a machine we do not have, we rent one for it.
We look at the job before we price it. The quote comes to you in writing, with the work spelled out. On a clearing job, it also says what happens to the brush and the trees.
Byhalia sits at the center of our service area. We work across North Mississippi, from DeSoto County out to Tupelo and Corinth.
Tell us where the property is and what you want done with it. Call or text (662) 415-2919 or use the form, and we will get back to you.
Tell us what you need done and where the property is. We look at the job and put the quote in writing.